D   a   y       L   o   g
D   a   y       L   o   g
Monday 2. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.5 7.75 6.25 7 6 5.5 0.75
II EX   0.75     ms
IIIa MCh 12.25 13 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 98.6 -3
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 52 8.75 24 8 0 2.5 4 -4
IXb FP        
X FA        
XI F   16.25 17.5 1.25 -1.25
XII NCh 13.25 15.5 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.25 0 2.5 4 -5.25
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 17.5 19.75 2.25 5 it.     -3
XVIIb ECh2 5.5     5.25
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 7.75 8.5 0.75 na     ms
XVIIIb EML2 51 13 24.25 1 na    
XIX AL 8.5 8.75 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 24.25 7 6 5.5
     
WLS in: 10% out: 50% in: out:
Walks ok ok CleanUps ms ms 1
13.25 15.5 16 24
12.25 16 16.25 19.75