D   a   y       L   o   g
D   a   y       L   o   g
Thursday 5. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.25 10.25 9 7 6 5.5 -2
II EX   0.75     ms
IIIa MCh 51 10.5 13.75 2.5 1.25     -1.25
IIIb MCh PF       4 it. Wght 98.1 ok
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   18.75 20.75 2 0 2.5 4 -2
IXb FP 52 11.25 22.75 2.75  
X FA        
XI F   16.25 17.5 1.25  
XII NCh 13.75 16.25 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6 0 2.5 4 -2
  S       2.75 9.5 9.5 9.5 -6.75
XVIIa ECh1 17.5 18.75 1.25 5 it.     -4
XVIIb ECh2 53 22.75 23.5 0.75 5.5     7
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2 1.5     -0.5
XVIIIa EML1 10.25 10.5 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 23.5 7 6 5.5
     
WLS in: 10% out: 10% in: out:
Walks ok ok CleanUps ms ms -1 -2 -1
11.25 12
12 20.75
incl. rather brief LT