D   a   y       L   o   g
D   a   y       L   o   g
Friday 6. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 6 6.5 7 6 5.5 0.5
II EX tn 6 6.75 0.75 0.75     ok
IIIa MCh 51 6.75 11 3 1.25     -1.75
IIIb MCh PF       4 it. Wght 97.6 -1
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 17.25 18.25 1 1    
IXa FD   11.25 12.25 1 0 2.5 4  
IXb FP   12.25 13.25 1  
X FA        
XI F   8.75 10 1.25  
XII NCh 13.25 17.25 4 2     -2
XIII PrN       0.25     ms
XIV NP F 18.25 20 1.75 0.75     -1
XII–XIV N       5.75 3     NA
XV S2b 21.5 25.75 4.25 3 2.75 2 2.25
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       5.25 4 2.75 2 3.25
XVI S3           1.5 3  
VII+VIII+XV PS       5.25 8 5.5 4 1.25
VII+VIII+XV+XVI RS       5.25 8 5.5 4 1.25
IX–XI FS       3.25 0 2.5 4  
  S       6.25 9.5 9.5 9.5 -3.25
XVIIa ECh1 20 21.5 1.5 5 it.     -4
XVIIb ECh2 5.5     9.25
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh       1.5 1.5     ok
XVIIIa EML1 11 11.25 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 25.75 7 6 5.5
     
WLS in: 10% out: 20% in: 10% out: 10%
Walks ok ok CleanUps ms ms -2 -3 -1
8.75 10