D   a   y       L   o   g
D   a   y       L   o   g
Monday 9. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 3.25 4.25 7 6 5.5 2.75
II EX   0.75     ms
IIIa MCh 4.5 5 0.5 1.25     0.75
IIIb MCh PF       4 it. Wght 97.6 -4
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 3.25 13.5 5 0 2.5 4 -1
IXb FP 52 13.5 25.25 3.25 -3.25
X FA        
XI F   19.5 21 1.5 -1.5
XII NCh 14 16 2 2     ok
XIII PrN       0.25     ms
XIV NP 53 6.5 19 5.5 0.75     -4.75
XII–XIV N       7.5 3     NA
XV S2b 25.25 25.75 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       9.75 0 2.5 4 -5.75
  S       3.75 9.5 9.5 9.5 -5.75
XVIIa ECh1 19 19.5 0.5 5 it.     -3
XVIIb ECh2 51 21 26.25 2.5 5.5     5.5
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       3 1.5     -1.5
XVIIIa EML1 4 4.5 0.5 na     ms
XVIIIb EML2 53 10 23.25 1.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 26.25 7 6 5.5
     
WLS in: 10% out: 10% in: 10% out: 35%
Walks ok ms CleanUps ms ms -3
4 5 6.5 10.75 23 25.75
13.75 16 17 23.25
10.75 13.75 14 23 10 17