D   a   y       L   o   g
Friday 13. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 8 8.25 7 6 5.5 -1.25
II EX   0.75     ms
IIIa MCh 51 1 8.75 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 95.8 -3
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 53 1.25 10 1.75 1     0.75
IXa FD 52 8 24 2.75 0 2.5 4  
IXb FP   20.5 21.5 1  
X FA        
XI F        
XII NCh 51 11.5 12.5 1 2     1
XIII PrN       0.25     ms
XIV NP 53 10 19.5 2.5 0.75     -1.75
XII–XIV N       3.5 3     NA
XV S2b 53 12.5 17.5 3.25 3 2.75 2 1.25
XVI S3 19.5 20.5 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       5 4 2.75 2 3
XVI S3       1   1.5 3  
VII+VIII+XV PS       5 8 5.5 4 1
VII+VIII+XV+XVI RS       6 8 5.5 4 2
IX–XI FS       3.75 0 2.5 4  
  S       7 9.5 9.5 9.5 -2.5
XVIIa ECh1 25.25 25.75 0.5 5 it.     -3
XVIIb ECh2 5.5     2.25
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       0.5 1.5     1
XVIIIa EML1 24 25.25 1.25 na     ms
XVIIIb EML2 na    
XIX AL 13.75 15.5 1.75 1.25 2.25 2.75 -0.5
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 25.75 7 6 5.5
     
WLS in: 10% out: 100% in: 5% out: 5%
Walks ms ms CleanUps ms ms -5 -2 -1
1 1.75 1.25 8.25 NCh included LT
8.25 21.5
1.75 8.75 11.5 17.5 13.75 15.5