D   a   y       L   o   g
D   a   y       L   o   g
Monday 16. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 7.5 7.5 7 6 5.5 -0.5
II EX   0.75     ms
IIIa MCh 51 7.75 14.25 2.75 1.25     -1.5
IIIb MCh PF 100% 100%   4 it. Wght 96.8 ok
II–III M       2.75 2     NA
IV FL   0.25     ms
V PrM   12.25 12.5 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 53 14.25 21.25 0.5 0 2.5 4 -0.5
IXb FP 52 8.75 22.25 4.25 -0.25
X FA        
XI F        
XII NCh 14.75 19.25 4.5 2     -2.5
XIII PrN   20.75 21 0.25 0.25     ok
XIV NP 19.25 20.25 1 0.75     -0.25
XII–XIV N       5.75 3     -2.75
XV S2b 3 2.75 2 ms
XVI S3 14.5 14.75 0.25   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       0.25   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -3.75
IX–XI FS       4.75 0 2.5 4 -0.75
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 20.25 20.75 0.5 5 it.     -3
XVIIb ECh2 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       0.5 1.5     1
XVIIIa EML1 51 7.5 12.25 0.5 na     ok
XVIIIb EML2 22.25 23 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR 23 23   0.25     ok
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 23 7 6 5.5
     
WLS in: 10% out: 100% in: 15% out: 10%
Walks ms ms CleanUps ms ms -7 -1 -1
7.75 12 8.75 12.5
12 21.25
14.5 21