D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 18. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.25 8.5 8.75 7 6 5.5 -1.75
II EX   0.75     ms
IIIa MCh 51 8.75 11.25 1.5 1.25     -0.25
IIIb MCh PF 100% 100%   4 it. Wght 96.0 ok
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM   12.75 13 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 12.5 12.75 0.25 1    
IXa FD 51 8.5 13.75 1.25 0 2.5 4 -0.5
IXb FP 52 9.5 18.75 3.25  
X FA        
XI F        
XII NCh 53 14 17.5 2.5 2     -0.5
XIII PrN   16.25 16.5 0.25 0.25     ok
XIV NP 16.5 17.25 0.75 0.75     ok
XII–XIV N       3.5 3     -0.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.25 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -3.75
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -3.75
IX–XI FS       4.5 0 2.5 4 -0.5
  S       4 9.5 9.5 9.5 -5.5
XVIIa ECh1 53 18.75 19.75 1 5 it.     -4
XVIIb ECh2 19.75 25.25 5.5 5.5     10.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       6.5 1.5     -5
XVIIIa EML1 13.75 14 0.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 25.25 7 6 5.5
     
WLS in: 5% out: 80% in: 25% out: 5%
Walks ok ms CleanUps ms ms -7 -1 -1
9.5 10.5 8.75 11.25 11.5 13
10.5 11.5 12.5 17.5
incl. 0.25=LT 16.25 17.25 ECh1=ugly LT, DN; ECh2=DN