D   a   y       L   o   g
D   a   y       L   o   g
Friday 20. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 7.5 9.25 7 6 5.5 -2.25
II EX   0.75     ms
IIIa MCh 51 7.5 10.5 1.5 1.25     -0.25
IIIb MCh PF 100% 100%   4 it. Wght 96.0 ok
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM   10.5 10.75 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 53 10.75 15.5 2.25 1     2.25
IXa FD   18 18.25 0.25 0 2.5 4 -0.25
IXb FP 52 12 21.5 4.5 -4.5
X FA        
XI F   8.5 10 1.5 -1.5
XII NCh 13.25 15.25 2 2     ok
XIII PrN   15.5 15.75 0.25 0.25     ok
XIV NP 16.5 18 1.5 0.75     -0.75
XII–XIV N       3.75 3     -0.75
XV S2b 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2.25 4 2.75 2 0.25
XVI S3           1.5 3  
VII+VIII+XV PS       2.25 8 5.5 4 -1.75
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -1.75
IX–XI FS       6.25 0 2.5 4 -2.25
  S       7.25 9.5 9.5 9.5 -2.25
XVIIa ECh1 22.75 23.5 0.75 5 it.     -4
XVIIb ECh2 5.5     4.25
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       0.75 1.5     0.75
XVIIIa EML1 21.5 22.75 1.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR 23.5 23.5   0.25     ok
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 23.5 7 6 5.5
     
WLS in: 80% out: 100% in: 90% out: 80%
Walks ok ms CleanUps ok ms -8 -2 -1
8.5 10
12.5 15.75 16.5 18.25
12 12.5 13.25 15.25