D   a   y       L   o   g
D   a   y       L   o   g
Saturday 21. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.5 10.75 11.25 7 6 5.5 -4.25
II EX 11 11.75 0.75 0.75     ok
IIIa MCh 12.25 14 1.75 1.25     -0.5
IIIb MCh PF 100% 100% 100% 4 it. Wght 96.0 -1
II–III M       2.5 2     -0.5
IV FL   0.25     ms
V PrM   14 14.25 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   10.75 11 0.25 0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 14.25 17.75 3.5 2     -1.5
XIII PrN   17.75 18 0.25 0.25     ok
XIV NP 18 19.5 1.5 0.75     -0.75
XII–XIV N       5.25 3     -2.25
XV S2b 19.5 20 0.5 3 2.75 2 -2.5
XVI S3 22 23 1   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       0.5 4 2.75 2 -3.5
XVI S3       1   1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -7.5
VII+VIII+XV+XVI RS       1.5 8 5.5 4 -6.5
IX–XI FS       0.25 0 2.5 4  
  S       2 9.5 9.5 9.5 -7.5
XVIIa ECh1 20 21.75 1.75 5 it.     -2
XVIIb ECh2 23 23.5 0.5 5.5     8.25
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 11.75 12.25 0.5 na     ok
XVIIIb EML2 21.75 22 0.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR 23 23   0.25     ok
XXI PrB       ms
I + XIV SLS       12.75 7.75 6.75 6.25 -5
I SL 23.5 7 6 5.5
     
WLS in: 75% out: 50% in: 100% out: 100%
Walks ok ok CleanUps ms ms -7 -1 1