D   a   y       L   o   g
D   a   y       L   o   g
Sunday 22. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 -0.5 8 8.25 7 6 5.5 -1.25
II EX 8.5 9.25 0.75 0.75     ok
IIIa MCh 9.25 10.75 1.5 1.25     -0.25
IIIb MCh PF 100% 100% 100% 4 it. Wght 96.0 ok
II–III M       2.25 2     -0.25
IV FL 10.75 11 0.25 0.25     ok
V PrM   11 11.25 0.25 0.25     ok
VI QU 11.25 11.75 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 11.75 14.25 2.5 4 2.75 2 -1.5
VIII S2a 1 1.25 0.25 1     -0.75
IXa FD   22 22.25 0.25 0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 14.25 16.75 2.5 2     -0.5
XIII PrN   16.75 17 0.25 0.25     ok
XIV NP 17 17.75 0.75 0.75     ok
XII–XIV N       3.5 3     -0.5
XV S2b 17.75 20 2.25 3 2.75 2 -0.75
XVI S3   1.5 3
VII S1       2.5 4 2.75 2 -1.5
VIII + XV S2       2.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       5 8 5.5 4 -3
VII+VIII+XV+XVI RS       5 8 5.5 4 -3
IX–XI FS       0.25 0 2.5 4 -0.25
  S       6.25 9.5 9.5 9.5 -3.25
XVIIa ECh1 20 21.5 1.5 5 it.     -2
XVIIb ECh2 22.25 22.5 0.25 5.5     6.5
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 8 8.5 0.5 na     ok
XVIIIb EML2 21.5 22 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR 22.5 22.5   0.25     ok
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 22.5 7 6 5.5
     
WLS in: 5% out: 10% in: 100% out: 60%
Walks ok ok CleanUps ok ms -8 -2 -1
1 1.25