D   a   y       L   o   g
D   a   y       L   o   g
Monday 2. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.5 9.25 9.75 7 6 5.5 -2.75
II EX 10 10.75 0.75 0.75     ok
IIIa MCh 10.75 12.75 2 1.25     -0.75
IIIb MCh PF 100% 100%   4 it. Wght 96.0 -1
II–III M       2.75 2     -0.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   12.75 13.5 0.75 0 2.5 4  
IXb FP        
X FA        
XI F   19 21 2  
XII NCh 13.5 17.5 4 2     -2
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       4 3     NA
XV S2b 3 2.75 2 ms
XVI S3 52 17.5 23.5 2.25   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.25   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -3.25
IX–XI FS       2.75 0 2.5 4  
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 18.75 19 0.25 5 it.     -4
XVIIb ECh2 51 21 25.25 2.5 5.5     9.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 9.25 10 0.75 na     ms
XVIIIb EML2 21.75 22.5 0.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 25.25 7 6 5.5
     
WLS in: 5% out: 5% in: out:
Walks ms ms CleanUps ms ms -2 -1 -1
21.75 23.5
18.75 22.5