D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 4. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3.25 5.25 8.5 7 6 5.5 -1.5
II EX 8 8.75 0.75 0.75     ok
IIIa MCh 13.5 15 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 97.0 -1
II–III M       2.25 2     -0.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   12 13 1  
X FA        
XI F        
XII NCh 15 17.5 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 51 8.75 18.5 3.25 0.75     -2.5
XII–XIV N       5.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 6.25 8 1.75   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3       1.75   1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS       1.75 8 5.5 4 -3.75
IX–XI FS       1 0 2.5 4  
  S       2.75 9.5 9.5 9.5 -6.75
XVIIa ECh1 52 18.5 25.25 6.75 5 it.     -4
XVIIb ECh2 5.5     11.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       6.75 1.5     -5.25
XVIIIa EML1 5.25 6.25 1 na     ms
XVIIIb EML2 51 11 13.5 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.75 7.75 6.75 6.25 -4
I SL 25.25 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ok ok CleanUps ms ms -4 -3 -1
12 13 11 17.5
incl. Lots of DN, LT