D   a   y       L   o   g
D   a   y       L   o   g
Saturday 7. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1 8.75 7.75 7 6 5.5 -0.75
II EX wk 11 11.75 0.75 0.75     ok
IIIa MCh 51 8.75 11 2.25 1.25     -1
IIIb MCh PF       4 it. Wght 95.6 -3
II–III M       3 2     -1
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 12 12.5 0.5 2     1.5
XIII PrN       0.25     ms
XIV NP 16.25 17 0.75 0.75     ok
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 12.5 15.75 3.25   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       3.25   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       3.25 8 5.5 4 -4.75
IX–XI FS         0 2.5 4  
  S       3.25 9.5 9.5 9.5 -6.25
XVIIa ECh1 17 21 4 5 it.     -4
XVIIb ECh2 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4 1.5     -2.5
XVIIIa EML1 15.75 16.25 0.5 na     ms
XVIIIb EML2 na    
XIX AL 51 11.75 12 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 21 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ok ok CleanUps ms ms -5 -4 1
Bičovaňie   DN & some LT