D   a   y       L   o   g
D   a   y       L   o   g
Monday 9. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 -1.75 10.5 7.25 7 6 5.5 -0.25
II EX 10.75 11.5 0.75 0.75     ok
IIIa MCh 51 -1 13 2 1.25     -0.75
IIIb MCh PF 100%     4 it. Wght 95.1 -1
II–III M       2.75 2     -0.75
IV FL   0.25     ms
V PrM   13 13.25 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   -0.5 4 4.5 0 2.5 4 -0.5
IXb FP 52 13.25 16.75 2 -2
X FA        
XI F   16.75 20 3.25 -3.25
XII NCh 13.75 15.25 1.5 2     0.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.75 0 2.5 4 -5.75
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 20 22.75 2.75 5 it.     -4
XVIIb ECh2 5.5     7
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 10.5 10.75 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.25 7.75 6.75 6.25 0.5
I SL 22.75 7 6 5.5
     
WLS in: 7% out: 40% in: out:
Walks ok ok CleanUps ms ms -6
-1 4 -0.5 11.5
13.75 15.25