D   a   y       L   o   g
D   a   y       L   o   g
Saturday 14. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.25 9.75 10 7 6 5.5 -3
II EX sr 12.75 13.5 0.75 0.75     ok
IIIa MCh 51 9.75 12.75 3 1.25     -1.75
IIIb MCh PF       4 it. Wght 96.2 -2
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 26 26.5 0.5 1    
IXa FD   20.75 26 5.25 0 2.5 4 -1.25
IXb FP        
X FA        
XI F        
XII NCh 16.5 18.5 2 2     ok
XIII PrN       0.25     ms
XIV NP 18.5 20.25 1.75 0.75     -1
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 13.5 15.25 1.75   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3       1.75   1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -1.75
IX–XI FS       5.25 0 2.5 4 -1.25
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 20.25 20.75 0.5 5 it.     -4
XVIIb ECh2 26.5 28 1.5 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2 1.5     -0.5
XVIIIa EML1 15.25 16.5 1.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.75 7.75 6.75 6.25 -4
I SL 28 7 6 5.5
     
WLS in: 10% out: 10% in: 5% out: 5%
Walks ok ms CleanUps ms ms -11 -5 -1
incl. DN, LT