D   a   y       L   o   g
D   a   y       L   o   g
Monday 16. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3 8 11 7 6 5.5 -4
II EX 8 8.75 0.75 0.75     ok
IIIa MCh 9.75 11.25 1.5 1.25     -0.25
IIIb MCh PF   10%   4 it. Wght 96.9 -1
II–III M       2.25 2     -0.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 9.25 12.25 1.5 0 2.5 4 -0.5
IXb FP        
X FA        
XI F   17 20 3  
XII NCh 13 17 4 2     -2
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       4 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.5 0 2.5 4 -0.5
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 20 25.25 5.25 5 it.     -4
XVIIb ECh2 5.5     11.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1 8.75 9.25 0.5 na     ms
XVIIIb EML2 na    
XIX AL 12.25 13 0.75 1.25 2.25 2.75 0.5
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11 7.75 6.75 6.25 -3.25
I SL 25.25 7 6 5.5
     
WLS in: 5% out: 5% in: out:
Walks ok ok CleanUps ms ms -11 1 1
9.75 11.25