D   a   y       L   o   g
D   a   y       L   o   g
Friday 20. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1 6 5 7 6 5.5 2
II EX wk 18.25 19 0.75 0.75     ok
IIIa MCh 51 6 9 3 1.25     -1.75
IIIb MCh PF 40% 100%   4 it. Wght 95.5 -2
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   10.5 13.25 2.75 -2.25
X FA        
XI F 52 9 18.25 3.5  
XII NCh 13.25 15.75 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP F 15.75 16.25 0.5 0.75     0.25
XII–XIV N       3 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25 0 2.5 4 -2.25
  S       2.75 9.5 9.5 9.5 -6.75
XVIIa ECh1 19 23 4 5 it.     -4
XVIIb ECh2 5.5     10.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4 1.5     -2.5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 23 7 6 5.5
     
WLS in: 5% out: 5% in: 10% out: 10%
Walks ok ok CleanUps ms ms -15 -3 -1
DN, LT  
10.5 16.25