D   a   y       L   o   g
D   a   y       L   o   g
Saturday 21. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 10.25 11.25 7 6 5.5 -4.25
II EX 10.25 11 0.75 0.75     ok
IIIa MCh 52 11 13.5 2.5 1.25     -1.25
IIIb MCh PF       4 it. Wght 96.0 -1
II–III M       3.25 2     -1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 13.5 15.75 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP 15.75 16.25 0.5 0.75     0.25
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS         0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 51 16.25 26 9.75 5 it.     -4
XVIIb ECh2 5.5     15.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       9.75 1.5     -8.25
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.75 7.75 6.75 6.25 -4
I SL 26 7 6 5.5
     
WLS in: 10% out: 5% in: 5% out: 5%
Walks ok ok CleanUps ms ms -16 -4 -1
largely DN  
incl. LT