D   a   y       L   o   g
D   a   y       L   o   g
Monday 23. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.25 10.5 9.25 7 6 5.5 -2.25
II EX 11.5 12.25 0.75 0.75     ok
IIIa MCh 13.25 14.5 1.25 1.25     ok
IIIb MCh PF 100%     4 it. Wght 96.0 ok
II–III M       2 2     ok
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   12.25 13.25 1 -0.25
X FA        
XI F 52 16 20 3.25  
XII NCh 51 14.5 18 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.25 0 2.5 4 -0.25
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 20 23.25 3.25 5 it.     -4
XVIIb ECh2 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 10.5 11.5 1 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.25 7.75 6.75 6.25 -1.5
I SL 23.25 7 6 5.5
     
WLS in: 5% out: 20% in: out:
Walks ok ok CleanUps ms ms -18 -1 -1
16 17.25
17.25 18