D   a   y       L   o   g
D   a   y       L   o   g
Friday 27. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 3.25 7.25 4 7 6 5.5 3
II EX bc 15.5 16.25 0.75 0.75     ok
IIIa MCh 11.5 12.75 1.25 1.25     ok
IIIb MCh PF       4 it. Wght 97.3 -4
II–III M       2 2     ok
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 7.25 17.5 2.25 -1.75
X FA        
XI F 51 8.5 15.5 3.5  
XII NCh 51 12.75 16.5 1 2     1
XIII PrN       0.25     ms
XIV NP 53 10 19.25 2.25 0.75     -1.5
XII–XIV N       3.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75 0 2.5 4 -1.75
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 19.25 23 3.75 5 it.     -4
XVIIb ECh2 5.5     6.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 10.75 11.5 0.75 na     ms
XVIIIb EML2 17.5 17.75 0.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 23 7 6 5.5
     
WLS in: 5% out: 80% in: 5% out: 5%
Walks ok ok CleanUps ms ms -22 -5 -1
10 13.5 13.5 16.25
8.5 16.5
10.75 17.75