D   a   y       L   o   g
D   a   y       L   o   g
Saturday 28. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 7.5 8.5 7 6 5.5 -1.5
II EX bc 10.75 11.5 0.75 0.75     ok
IIIa MCh 52 11.5 16 4.5 1.25     -3.25
IIIb MCh PF   100%   4 it. Wght 95.7 ok
II–III M       5.25 2     -3.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 51 9.75 16.5 1.5 0.75     -0.75
XII–XIV N       1.5 3     NA
XV S2b 21.75 23.25 1.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       1.5 4 2.75 2 -2.5
XVI S3           1.5 3  
VII+VIII+XV PS       1.5 8 5.5 4 -6.5
VII+VIII+XV+XVI RS       1.5 8 5.5 4 -6.5
IX–XI FS         0 2.5 4  
  S       1.5 9.5 9.5 9.5 -8
XVIIa ECh1 16.5 21.75 5.25 5 it.     -4
XVIIb ECh2 5.5     10.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1 7.5 9.75 2.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 23.25 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ok ms CleanUps ms ms -23 -6 -1
10.75 16
DN