D   a   y       L   o   g
D   a   y       L   o   g
Monday 30. marca 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 -2.75 10.5 11.5 7 6 5.5 -4.5
II EX   0.75     ms
IIIa MCh 51 10.5 13.25 2.75 1.25     -1.5
IIIb MCh PF       4 it. Wght 95.1 -2
II–III M       2.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 52 13.25 23.25 10 2     -8
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       10 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS         0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 5 it.     -4
XVIIb ECh2 5.5     12.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.5 7.75 6.75 6.25 -3.75
I SL 23.25 7 6 5.5
     
WLS in: 5% out: 25% in: out:
Walks ok ms CleanUps ms ms -25 -1 -1
2 3.75 DN
furious LT & DN