D   a   y       L   o   g
Tuesday 1. marca 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -4.25 3.75 8 7 6 5.5 -1
II EX   0.75     ms
III MCh 47 4.5 9.5 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM   9.5 10 0.5 0.25     -0.25
VI QU   0.5     ms
IV–VI US       0.5 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 13 5.5   2.5 4 -1.5
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 14.75 1.75 2     0.25
XIII PrN   14.75 15 0.25 0.25     ok
XIV NP 15 18 3 0.75     -2.25
XII–XIV N       5 3     -2
XV S2b 3 2.75 2 ms
XVI S3 25.25 27.25 2   1.5 3
VII S1         4 2.75 2 -1
VIII + XV S2         4 2.75 2 -1
XVI S3       2   1.5 3  
VII+VIII+XV PS         8 5.5 4 -2
VII+VIII+XV+XVI RS       2 8 5.5 4 -2
IX–XI FS       5.5   2.5 4 -1.5
  S       8.5 9.5 7 5.5 -1
XVIIa ECh1 21 23.75 2.75 5 it.     -3
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 3.75 4.5 0.75 na     ok
XVIIIb EML2 49 18 25.25 3 na    
XIX AL 19.75 21 1.25 1.25 2.25 2.75 ok
XVIII–XIX Out       5 1.25 2.25 2.75 -3.75
XX JR   0.25     ms
XXI PrB   23.75 24 0.25 ok
I + XIV SLS       11 7.75 6.75 6.25 -3.25
I SL 27.25 7 6 5.5
 
6.5 9 MCh 4 ok
9 10
19.75 24 -1 -2 -1