D   a   y       L   o   g
Tuesday 8. marca 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 2.75 4.75 7 6 5.5 2.25
II EX out 8 8.75 0.75 0.75     ok
III MCh 47 2.75 10 3 1.25     -1.75
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 3.5 16.25 3.75   2.5 4 -3.75
X FA         2.5 4  
XI F 49 7.25 18 5.5   2.5 4 -1.5
XII NCh 13 15 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.25   2.5 4 -5.25
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 18.75 23.5 4.75 5 it.     -2
XVIIb ECh2 23.75 24 0.25 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       5 1.5     -3.5
XVIIIa EML1 4.75 5 0.25 na     ok
XVIIIb EML2 49 18 23.75 1 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.75 7.75 6.75 6.25 3
I SL 24 7 6 5.5
 
3.5 6.25 7.25 8.75 MCh 4 ok
4.75 5 6.25 15
8 10 13 16.25 18.75 23.5 -6 1