D   a   y       L   o   g
Friday 11. marca 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 8 9.75 7 6 5.5 -2.75
II EX 9.75 10.5 0.75 0.75     ok
III MCh 10.5 11.75 1.25 1.25     ok
II–III M       2 2     ok
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 47 11.75 21 7.25   2.5 4 -3.25
XII NCh 12.75 14.75 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.25   2.5 4 -3.25
  S         9.5 7 5.5 -5.5
XVIIa ECh1 21 24.75 3.75 5 it.     -4
XVIIb ECh2 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 8 9.75 1.75 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 24.75 7 6 5.5
 
12.75 14.75 MCh 4 ok
-9 -3 -1