D   a   y       L   o   g
Saturday 9. apríla 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 47 -1.75 11 11.75 7 6 5.5 -4.75
II EX inc 11 11.75 0.75 0.75     ok
III MCh 47 -0.5 13 2.25 1.25     -1
II–III M       3 2     -1
IV FL 13 13.25 0.25 0.25     ok
V PrM   13.25 13.5 0.25 0.25     ok
VI QU 13.5 14 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 19.75 20.5 0.75 4 2.75 2 -3.25
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14 17.5 3.5 2     -1.5
XIII PrN   18.75 19 0.25 0.25     ok
XIV NP 19 19.75 0.75 0.75     ok
XII–XIV N       4.5 3     -1.5
XV S2b 20.5 21.5 1 3 2.75 2 -2
XVI S3   1.5 3
VII S1       0.75 4 2.75 2 -3.25
VIII + XV S2       1 4 2.75 2 -3
XVI S3           1.5 3  
VII+VIII+XV PS       1.75 8 5.5 4 -6.25
VII+VIII+XV+XVI RS       1.75 8 5.5 4 -6.25
IX–XI FS           2.5 4  
  S       3.25 9.5 7 5.5 -6.25
XVIIa ECh1 21.5 21.75 0.25 5 it.     -3
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       0.25 1.5     1.25
XVIIIa EML1 17.5 18.75 1.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR 21.75 21.75   0.25     ok
XXI PrB   21.75 22 0.25 ok
I + XIV SLS       12.5 7.75 6.75 6.25 -4.75
I SL 22 7 6 5.5
 
-0.5 0.5 0.5 11.75 includes nightly DN MCh 4 ok
-9 -6 -1