D   a   y       L   o   g
Thursday 16. júna 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 5.25 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 47 5.25 10.5 3.25 1.25     -2
II–III M       3.25 2     NA
IV FL   0.25     ms
V PrM   15.5 15.75 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 7 18.5 5.5   2.5 4 -1.5
XII NCh 49 11.75 15.5 2.25 2     -0.25
XIII PrN   15.75 16 0.25 0.25     ok
XIV NP F 10.5 11.5 1 0.75     -0.25
XII–XIV N       3.5 3     -0.5
XV S2b 18.5 19 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       5.5   2.5 4 -1.5
  S       1 9.5 7 5.5 -8.5
XVIIa ECh1 19 21 2 5 it.     ok
XVIIb ECh2 21.5 22 0.5 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 6.5 7 0.5 na     ok
XVIIIb EML2 49 11.5 21.5 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8 7.75 6.75 6.25 -0.25
I SL 22 7 6 5.5
 
6.5 8.5 MCh 4 ok
8.5 12.5 14 16 8
12.5 14 11.75 21 -13 -3 -1