D   a   y       L   o   g
Thursday 15. septembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 3.75 3.75 7 6 5.5 3.25
II EX   0.75     ms
III MCh 47 3.75 10.25 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 5.25 15.25 9   2.5 4 -5
X FA         2.5 4  
XI F   15.25 18 2.75   2.5 4 -2.75
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP F 10.25 10.5 0.25 0.75     0.5
XII–XIV N       0.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       11.75   2.5 4 -7.75
  S       9 9.5 7 5.5 -0.5
XVIIa ECh1 18 21.5 3.5 5 it.     -4
XVIIb ECh2 24.5 25.25 0.75 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1 47 4.75 10.75 0.75 na     ok
XVIIIb EML2 21.5 24.5 3 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3.75 1.25 2.25 2.75 -2.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4 7.75 6.75 6.25 3.75
I SL 25.25 7 6 5.5
 
4.75 9.75 5.25 10.5 MCh 4 -2
9.75 10.75 5.75
-10 -2 1