D   a   y       L   o   g
Thursday 29. septembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.25 6.75 4 7 6 5.5 3
II EX   0.75     ms
III MCh 47 4.5 6 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   8 13 5   2.5 4 -1
X FA         2.5 4  
XI F   14.5 15.25 0.75   2.5 4 -0.75
XII NCh 48 13 21 7.25 2     -5.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       7.25 3     NA
XV S2b 21 21.75 0.75 3 2.75 2 -1.25
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.75 4 2.75 2 -1.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -3.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -3.25
IX–XI FS       5.75   2.5 4 -1.75
  S       5.75 9.5 7 5.5 -3.75
XVIIa ECh1 21.75 24 2.25 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 6.75 8 1.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4 7.75 6.75 6.25 3.75
I SL 24 7 6 5.5
 
4.5 6 DN MCh 4 -3
14.5 15.25 11
-22 -2 -1