D   a   y       L   o   g
Wednesday 30. novembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 7 8.75 7 6 5.5 -1.75
II EX   0.75     ms
III MCh 7 7.5 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   7.5 13.5 6   2.5 4 -2
XII NCh 47 13.5 17.75 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP 17.75 19.75 2 0.75     -1.25
XII–XIV N       5.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6   2.5 4 -2
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19.75 22.25 2.5 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 15.5 16 0.5 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 22.25 7 6 5.5
 
15.5 16 MCh 4 -3
6.75
-30 -3 -1