D   a   y       L   o   g
Monday 12. decembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2 5.5 3.5 7 6 5.5 3.5
II EX   0.75     ms
III MCh 47 5.5 10 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   6.25 8.75 2.5   2.5 4 -1
X FA         2.5 4  
XI F   10 12.5 2.5   2.5 4  
XII NCh 12.5 14.25 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 14.75 18 3.25 0.75     -2.5
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5   2.5 4 -1
  S       2.5 9.5 7 5.5 -7
XVIIa ECh1 19 21.25 2.25 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 14.25 14.75 0.5 na     ms
XVIIIb EML2 48 18 22.25 2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 22.25 7 6 5.5
 
6.25 8.75 MCh 4 -3
19 21.25 6
-12 -1 -1