D   a   y       L   o   g
Saturday 12. februára 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 7 10.5 3.5 7 6 5.5 3.5
II EX   0.75     ms
III MCh 47 10.5 13 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL 13.25 13.5 0.25 0.25     ok
V PrM   13 13.25 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.5 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.5 16.5 3 2     -1
XIII PrN   19.75 20 0.25 0.25     ok
XIV NP 482f 11.25 19 2.5 0.75     -1.75
XII–XIV N       5.75 3     -2.75
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S       1 9.5 7 5.5 -8.5
XVIIa ECh1 17 17.75 0.75 5 it.     -4
XVIIb ECh2 49 19 22 1.75 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 16.5 17 0.5 na     ok
XVIIIb EML2 na    
XIX AL 20 20.75 0.75 1.25 2.25 2.75 0.5
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR 22 22   0.25     ok
XXI PrB   20.75 21 0.25 ok
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 22 7 6 5.5
 
11.25 12.5 MCh 4 -4
12.5 17.75
19.75 21 -9 -3 -1