D   a   y       L   o   g
Tuesday 15. marca 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.75 4.25 3.5 7 6 5.5 3.5
II EX   0.75     ms
III MCh 7.25 8.25 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   5 7.25 2.25   2.5 4 -2.25
X FA         2.5 4  
XI F 48 8.25 18 8.25   2.5 4 -6.5
XII NCh 47 13 17 1.5 2     0.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       10.5   2.5 4 -6.5
  S       2.25 9.5 7 5.5 -7.25
XVIIa ECh1 18 22 4 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4 1.5     -2.5
XVIIIa EML1 4.25 5 0.75 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       3.5 7.75 6.75 6.25 4.25
I SL 22 7 6 5.5
 
13.5 16 MCh 4 ok
13 13.5 16 17
-13 -2 -1