D   a   y       L   o   g
Monday 23. mája 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 8 9.5 7 6 5.5 -2.5
II EX   0.75     ms
III MCh 47 8.75 11.75 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 8.25 10.5 1.75   2.5 4 -1.25
X FA         2.5 4  
XI F 49 12.5 18 3.5   2.5 4  
XII NCh 13.5 15.5 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.25   2.5 4 -1.25
  S       1.75 9.5 7 5.5 -7.75
XVIIa ECh1 18 18.75 0.75 5 it.     -3
XVIIb ECh2 19.5 23.5 4 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       4.75 1.5     -3.25
XVIIIa EML1 8 8.25 0.25 na     ok
XVIIIb EML2 47 11.75 19.5 1.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 23.5 7 6 5.5
 
9.25 10.5 12.5 18.75 MCh 4 ok
8.75 9.25
13.5 15.5 -23 -1 -1