D   a   y       L   o   g
Saturday 28. mája 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3 10 13 7 6 5.5 -6
II EX sur 10 10.75 0.75 0.75     ok
III MCh 10.75 15.5 4.75 1.25     -3.5
II–III M       5.5 2     -3.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 15.5 18.5 3 2     -1
XIII PrN       0.25     ms
XIV NP 18.5 21 2.5 0.75     -1.75
XII–XIV N       5.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S       0.25 9.5 7 5.5 -9.25
XVIIa ECh1 21 21.75 0.75 5 it.     ok
XVIIb ECh2 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       0.75 1.5     0.75
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR 21.75 21.75   0.25     ok
XXI PrB   21.75 22 0.25 ok
I + XIV SLS       15.5 7.75 6.75 6.25 -7.75
I SL 22 7 6 5.5
 
MCh 4 -4
-28 -6 -1