D   a   y       L   o   g
Friday 10. júna 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 7.75 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 47 7.75 10.25 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 10.25 18 5.75   2.5 4 -1.75
XII NCh 12.75 14.75 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S         9.5 7 5.5 -9.5
XVIIa ECh1 18 22.25 4.25 5 it.     -2
XVIIb ECh2 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 22.25 7 6 5.5
 
including about 15 Min. of LT,DN MCh 4 ok
12.75 14.75 8.75
-8 -4 -1