D   a   y       L   o   g
Tuesday 2. augusta 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 9.75 11.5 7 6 5.5 -4.5
II EX inc   0.75     ms
III MCh 47 9.75 13.75 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 13.75 18.25 2.25   2.5 4  
XII NCh 15 17.25 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 49 11.5 21 2.75   1.5 3 -0.75
VII S1         4 2.75 2 -1.75
VIII + XV S2         4 2.75 2 -2
XVI S3       2.75   1.5 3 -0.75
VII+VIII+XV PS         8 5.5 4 -3.75
VII+VIII+XV+XVI RS       2.75 8 5.5 4 -3
IX–XI FS       2.25   2.5 4  
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 18.75 20 1.25 5 it.     -2
XVIIb ECh2 21 24.25 3.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       4.5 1.5     -3
XVIIIa EML1 10.5 11.5 1 na     ok
XVIIIb EML2 18.25 18.75 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.5 7.75 6.75 6.25 -3.75
I SL 24.25 7 6 5.5
 
10.5 13.25 MCh 4 -4
15 17.25 8
13.25 20 1 1 1