D   a   y       L   o   g
Tuesday 23. augusta 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 6.25 6.25 7 6 5.5 0.75
II EX sur 6.25 7 0.75 0.75     ok
III MCh 7 12.25 5.25 1.25     -4
II–III M       6 2     -4
IV FL   0.25     ms
V PrM   13.25 13.5 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 47 13.5 18.5 4   2.5 4  
XII NCh 15 16 1 2     1
XIII PrN       0.25     ms
XIV NP F 13 13.25 0.25 0.75     0.5
XII–XIV N       1.25 3     NA
XV S2b 48 20.75 22.75 2 3 2.75 2 ok
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2 4 2.75 2  
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -2
VII+VIII+XV+XVI RS       2 8 5.5 4 -2
IX–XI FS       4   2.5 4  
  S       2.25 9.5 7 5.5 -7.25
XVIIa ECh1 18.5 20.25 1.75 5 it.     -4
XVIIb ECh2 22.75 24.25 1.5 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 12.25 13 0.75 na     ok
XVIIIb EML2 20.25 20.75 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.5 7.75 6.75 6.25 1.25
I SL 24.25 7 6 5.5
 
15 16 MCh 4 ok
Artmedia Petržalka Miracles 10.25
-8 1