D   a   y       L   o   g
Sunday 2. októbra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -3 9.25 11.75 7 6 5.5 -4.75
II EX   0.75     ms
III MCh 9.25 11 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 11 13 2 4 2.75 2 -2
VIII S2a 1     -1
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 21 8 2     -6
XIII PrN       0.25     ms
XIV NP 21 23.75 2.75 0.75     -2
XII–XIV N       10.75 3     NA
XV S2b 5 5.5 0.5 3 2.75 2 -2.5
XVI S3   1.5 3
VII S1       2 4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -3.5
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -5.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -5.5
IX–XI FS           2.5 4  
  S       2.5 9.5 7 5.5 -7
XVIIa ECh1 23.75 27 3.25 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       14.5 7.75 6.75 6.25 -6.75
I SL 27 7 6 5.5
 
5 5.5 MCh 4 -2
13
-2 -5 -1