D   a   y       L   o   g
Tuesday 15. novembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.25 3 1.75 7 6 5.5 5.25
II EX   0.75     ms
III MCh 47 5.75 12 4.75 1.25     -3.5
II–III M       4.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   3 5.75 2.75   2.5 4 -2.75
X FA         2.5 4  
XI F 48 7 18.25 4   2.5 4  
XII NCh 47 12 17.25 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.75   2.5 4 -2.75
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 18.25 20 1.75 5 it.     -4
XVIIb ECh2 23 23.5 0.5 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 20 23 3 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       1.75 7.75 6.75 6.25 6
I SL 23.5 7 6 5.5
 
7 8.5 13.5 15 MCh 4 ok
8.5 13.5 15 17.25 10.75
-15 -2 -1