D   a   y       L   o   g
D   a   y       L   o   g
Saturday 21. januára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 10.75 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 11 17.5 6.5 1.25     -5.25
II–III M       6.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 18.25 22.75 4.5 2     -2.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       4.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 5 it.     -3
XVIIb ECh2 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     NA
XVIIIa EML1 10.75 11 0.25 na     ok
XVIIIb EML2 17.5 18.25 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 22.75 7 6 5.5
 
MCh 4 -3
11
-19 -6 -1