D   a   y       L   o   g
Monday 6. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.75 10 10.75 7 6 5.5 -3.75
II EX sur 16.5 17.25 0.75 0.75     ok
III MCh 47 10 13.25 2.75 1.25     -1.5
II–III M       3.5 2     -1.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.25 16.5 3.25 2     -1.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       3.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 20.75 21.5 0.75 5 it.     -3
XVIIb ECh2 21.75 23.25 1.5 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 11 11.5 0.5 na     ok
XVIIIb EML2 48 17.25 21.75 3.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       4.25 1.25 2.25 2.75 -3
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 23.25 7 6 5.5
 
11 11.5 MCh 4 -2
20.75 21.5 9
-4 -1 -1