D   a   y       L   o   g
Thursday 9. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 3.25 4.25 7 6 5.5 2.75
II EX   0.75     ms
III MCh 47 5.5 11.5 4.5 1.25     -3.25
II–III M       4.5 2     NA
IV FL   0.25     ms
V PrM   7.5 7.75 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 49 3.75 9.5 2.5   2.5 4 -1.75
X FA         2.5 4  
XI F 48 7 18.75 3.25   2.5 4  
XII NCh 50 12.5 17.25 3.25 2     -1.25
XIII PrN   13.5 13.75 0.25 0.25     ok
XIV NP F 11.75 12.25 0.5 0.75     0.25
XII–XIV N       4 3     -1
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       3 9.5 7 5.5 -6.5
XVIIa ECh1 18.75 21.25 2.5 5 it.     -3
XVIIb ECh2 22.5 23 0.5 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       3 1.5     -1.5
XVIIIa EML1 3.25 3.75 0.5 na     ok
XVIIIb EML2 48 11.5 22.5 1.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.75 7.75 6.75 6.25 3
I SL 23 7 6 5.5
 
7 7.75 8.75 9.5 MCh 4 -1
7.5 13.75 15 17.25 11.75 12.25 12.5 21.25 10.75
5.5 8.75 -5 -2 1
13.5 15