D   a   y       L   o   g
Friday 10. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 8.75 9.75 7 6 5.5 -2.75
II EX inc 12 12.75 0.75 0.75     ok
III MCh 47 8.75 13.75 2 1.25     -0.75
II–III M       2.75 2     -0.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   10.5 12 1.5   2.5 4 -0.5
X FA         2.5 4  
XI F   15 18 3   2.5 4  
XII NCh 13.75 15 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.5   2.5 4 -0.5
  S       1.5 9.5 7 5.5 -8
XVIIa ECh1 18 24 6 5 it.     -3
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       6 1.5     -4.5
XVIIIa EML1 9.75 10.5 0.75 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 52 24 7 6 5.5
 
incl. LT… 9.75 12.75 MCh 4 ok
Conjecture 10
-6 -3 -1