D   a   y       L   o   g
D   a   y       L   o   g
Saturday 8. novembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.25 10.5 9.25 7 6 5.5 -2.25
II EX   0.75     ms
IIIa MCh 1.25     ms
IIIb MCh PF   100% 100% 4 it. Wght 86.7 -4
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   13.25 15.75 2.5 0 2.5 4  
IXb FP   12.5 13.25 0.75  
X FA        
XI F        
XII NCh 15.75 20 4.25 2     -2.25
XIII PrN   19.75 20 0.25 0.25     ok
XIV NP 20 21 1 0.75     -0.25
XII–XIV N       5.5 3     -2.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       3.25 0 2.5 4  
  S       1.25 9.5 9.5 9.5 -8.25
XVIIa ECh1 21 24.5 3.5 5 it.     -3
XVIIb ECh2 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.5 1.5     -2
XVIIIa EML1 10.5 12.5 2 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR 24.5 24.5   0.25     ok
XXI PrB   24.5 24.75 0.25 ok
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 24.75 7 6 5.5
     
WLS in: 50% out: 10% in: 10% out: 5%
Walks ok ok CleanUps ok ok -4 -4 -1