D   a   y       L   o   g
D   a   y       L   o   g
Sunday 21. decembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 4 13.5 9.5 7 6 5.5 -2.5
II EX   0.75     0.75
IIIa MCh 14.5 16 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 93.8 -3
II–III M       1.5 2     0.5
IV FL   0.25     0.25
V PrM       0.25     0.25
VI QU   0.5     0.5
IV–VI US         1     1
VII S1 4 2.75 2 -4
VIII S2a 1     -1
IXa FD   16.5 19.5 3 0 2.5 4 -3
IXb FP        
X FA        
XI F        
XII NCh 2     2
XIII PrN       0.25     0.25
XIV NP   0.75     0.75
XII–XIV N         3     3
XV S2b 3 2.75 2 -3
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       3 0 2.5 4 -3
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 5 it.      
XVIIb ECh2 5.5     1.5
XVIIc TXT   na      
XVIId PRG   na      
XVII ECh         1.5     1.5
XVIIIa EML1 13.5 14.5 1 na      
XVIIIb EML2 16 16.5 0.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25      
XXI PrB       0.25
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 24 7 6 5.5
     
WLS in: 10% out: 10% in:   out:  
Walks     CleanUps     -20 -6